top of page

CALVERT COUNTY DETENTION

Construction of a 1600sq.ft. one story masonry building, with all new plumbing and utility connections. Includes demolition, removal of buried utilities,

waterproofing the foundation, secure doors and windows, and SBS roof.

Nastos installed direct-expansion cooling and gas-fired roof-mounted units coupled to variable air volume terminal units with hot water reheat to maintain individual space control. Each roof-mounted unit that requires more than 30% outside air will contain an energy recovery wheel which will allow the units to work at maximum efficiency.

CALDC_00368.jpg

Electrical system includes energy efficient lighting and automatic controls, telecommunications system and a fire alarm mass notification system.

bottom of page